These are pictures of the CID building desperately in need of renovation

 

Side of CID before taking of the panelwork (April 21-'06)
CID after stripping (April 21-'06)
April 21 - '06
April 21 - '06

April 27 - '06

April 27 - '06

April 27 - '06
April 27 - '06
Front of the building
Bad condition of the woodwork

The ceiling at entrance of the Center, brown stains as a result of the water leaking trough the roof

 
 
 



 
   

 

All Rights Reserved. Center for Islamic Development © 1998-2007